Similar presentations:
3AZ1000EEJG14_A1_000_00
1.
Serial number 1.electrostatic protectionscanning2.UPS serial number scanning
1
2
2.
prepareparts-
1.base*1PCS
2.rubber ring*2PCS
1
2
2PCS
191173505UD1000
191423013100000
assembly-install rubber ring*2PCS
1
2
3.
prepare parts- rubber foot*2PCSassembly- paste rubber foot*2PCS
2PCS
1
191402066000000
2
4.
prepareparts -
1.spacing board*1PCS
2.snap bushing*1PCS
3.screw M3*1PCS
191405003900000
191221032000000
assembly-
embed snap bushing in spacing
board*1PCS,lock with screw*1PCS
1
1
2
3
embed bushing in
spacing board
2
tool
191173501UV1000
storage
location
T2
name
electric screw
driver
spec
5~7
Kgf-cm
5.
prepareparts -
1.rear panel parts *1PCS
2.rear panel parts *1PCS
Check that the silk screen printing on the rear panel
is clear
191173503UH1000
3.screw M3*6mm *6PCS
191313065504001
4.screw M3*6mm *3PCS
191313062103000
1
3
191173500YQ1000
2
tool
4
storage
location
T2
name
electric screw
driver
spec
5~7
Kgf-cm
Correct terminal
shape/color/tongue orientation
6.
assembly -spacing board、front panel、rear panel with screw locked*9PCS
2
1
6PCS
4
3
6
3PCS
5
7
8
9
7.
prepare parts-
1.battery pack kit*1PCS
2.battery pack kit*1PCS
192017362153000
192017362B2100
0
1
2
fold along the dotted line
8.
assembly-Battery pack folds along dotted line and snaps into base*2PCS1
2
Battery pack door snaps into lower cover stud
9.
Point inspection confirmation1
point inspection confirm battery pack rail*2PCS,snap bushing*1PCS,rubber
foot*2PCS,nut*1PCS
1
2
1PCS
3
1PCS
4
5
6
2PCS
10.
Point inspection confirmation 2 check locked screw*9PCS rubber ring*2PCS1
2
10
11
6PCS
4
3
6
3PCS
5
2PCS
7
8
9