819.26K
Category: industryindustry

Energy Taskforce “Europe East”

1.

Taskforce Meeting “Europe East”
Medgidia, 3rd March 2020
Plant name:
Cement LLC, Odesa, CRH Ukraine
Energy representative:
Syrotych Ostap, automation engineer

2.

Electricity Roadmap “Ambition” (up to 2022)
Plant name
Unit
2015
2016
2017
2018
2019
2020
2021
2022
Clinker production
M (t)
Clinker total
kWh/t
Cement production
M(t)
0.350
0.433
0.451
0.478
0.427
0.428
0.480
0.480
Cement total
kWh/t
69.7
65.4
63.2
61.1
58.8
58.9
57.9
57.8
Clinker factor
%
65
67
69
68
67.7
67.4
66.9
66.7
Fixed load
kWh/t
10.0
8.1
7.8
7.3
8.2
5.1
4.6
4.6
Base load
kWh/t
5.5
4.5
4.3
4.0
4,6
4.8
4.3
4.3
Total electricity
kWh/t
69.7
65.4
63.2
61.1
58.8
58.9
57.9
57.8
Product ‘Name’ produced the most
Name
CEM II/42.5
R
CEM II/42.5
R
% production
%
30
31
32
38
41.5
41.3
39.6
39,6
Clinker factor “for this product type”
%
82
84
84
83
80.6
80.2
79.5
79
Blaine
Cm2/g
3793
3935
3789
4073
4238
4196
4100
4100
4.6/1.2
4.2/1.0
3.6/0.9
3.7/1.0
3.8/1.2
3.8/1.1
3.5/1.0
3.5/1.0
29.0/52.3
29.3/50.8
29.2/51.4
29.6/50.9
30.5/52.3
30.7/52.5
29.5/51.5
29.5/51.5
0.7495
0.7764
0.8126
0.8318
0.8895
0.8913
0.8598
0.8759
(measurement of all samples)
Residue (measurement of all samples)
R32 / R 45
Strength development (2d / 28d)
MPa
Strength development (28d) divided by the
cement variable kWh/t
MPa (28d) /
(kWh/t)
2 |
CEM II/42.5
R
CEM II/42.5 R
CEM
II/42.5 R
CEM II/42.5 R
CEM II/42.5
R
CEM II/42.5
R

3.

Energy Projects – Plant specific
Duration
(Term)
Project Description
Expected Completion
Responsibility
in plant
Energy Saving
K€ saved
Energy Saving
kWh/t reduction
Medium 1-3 years
CM4,5 : Bearing cooling optimisation
01.04.2020.
Roman Fedorushchenko
4.0
0.14
* 3 projects to be implemented
Optimisation of the cement transport equipment
work, excluding work in idle
01.06.2020.
Ostap Syrotych
9.2
0.32
Cement transport from Silos to the Packing Plant
optimisation. (Now we are consulting with the
equipment producer regarding expediency of the
machinery upgrade)
01.08.2020.
Roman Fedorushchenko/Ostap
Syrotych
6.6
0.23
Packing Plant: Optimisation of cement spill
transportation to the bins.
01.10.2020.
Roman Fedorushchenko
4.6
0.16
Optimisation of the cement transport from the
CM4,5 to the Silos
01.06.2021.
Roman Fedorushchenko
60.2
2.09
Lighting optimisation
01.10.2021.
Roman Fedorushchenko
4.3
0.15
Optimisation of the cement transport from CM6 to
Silos (change pneumatic transport to elevator with
air slides)
01.05.2022.
Roman Fedorushchenko/Ostap
Syrotych
28.0
0.93
Replace old cranes to new with frequency
converters
01.09.2022.
Roman Fedorushchenko
5.4
0.18
Long > 3 years:
1- 2 projects to be implemented
3 |

4.

Review of action log from previous meeting
Plant
4 |
Comments
(Summary
of main
points)
Action
Action Completed
Power metering application
We have received the price for required amount of equipment and
works, need to prepare CX application
Tromp curve to be checked on Mill 6 & Mills 4+5
Periodic yearly Tromp Curve inspection is planned for March
Electronic ear on second compartment in Mill 6
We have received the commercial proposal for this project
To be considered for Mills 4 +5 electronic ear
We have received the commercial proposal for this project
False air measurements to be checked
This practice needs to be implemented
Auto stop function to be considered for Mill 6 and to be
installed before year end (share the knowledge from
Pod)
We have received the commercial proposal for this project
Energy saving register
Were created energy saving register and set the periodic quarterly
meetings

5.

Energy Saving Initiatives implemented in plant
Plant
Odesa
Cement
5 |
Action
Comments (Summary of main points)
Energy reduction
- kWh/t
Heating
optimisation
Change electrical heating to gas heating
0.07
System of auto
operation for the
CM6 installation
Installation FLS PXP system – PXP was implemented in the
beginning of this year , so calculations regarding energy reduction
based on 4 months of stable work with PXP system. To have more
accurate reduction value it’s necessary to repeat this calculations
after few months
1.9
Lighting
optimisation
Partly done lighting optimisation (changed 211 sources of lighting to
LED)
0,03
English     Русский Rules