Similar presentations:
Siemens production system. Success story
1. Siemens Production System Success Story
Author: Starostin SergeyKrasikov Mikhail
Date: 10.12.2012
Copyright © Siemens AG 2008. All rights reserved.
2. Overview Site (краткий обзор)
SiteProducts
The horizontally rotary
disconnectors following types
Processing area of
Горизонтально-поворотные
disconnectors
разъединители следующих типов:
Производственный участок
DBF2-123N+(2)AE
разъединителей
DBF4-123N+(2)AE
DBF2-245N+(2)AE
DBF4-245N+(2)AE
Copyright © Siemens AG 2008. All rights reserved.
Page 2
2008
Siemens Production System – Success Story
Company
3. Production – Initial situation (производство – текущее состояние)
1. Area for drives testing - участок для испытания приводов:1 testing device ACTAS (modernization is necessary to check drives under 380V)
1 испытательная установка ACTAS (требует модернизации, для проверки моторов под 380V);
1 electrical engineer 1 инженер-электрик
1 fitter for preliminary preparation and following packing of drives)
1 слесарь механосборочных работ для предварительной подготовки и последующей упаковки приводов;
60 drives per week, without adaptation (without scheme changing)
60 приводов в неделю, без адаптации (без изменения схемы);
deficiency of hoisting device - отсутствие г/п механизмов.
2. Area for checking of main contact system - участок для проверки главной контактной системы:
2 device for test - 2 прибора для испытания;
1 electrical fitter - 1 слесарь электрик;
105 contact pair per week (without additional assembly and adaptation)
105 контактных пар в неделю (без дополнительной сборки и доработки);
deficiency of special tools (stand) - отсутствие специализированных приспособлений (стенд).
3. Area for furnishing and preliminary preparation (if adaptation is needed)
Участок для комплектации и механосборочных работ (если необходима доработка):
bench tools - слесарный инструмент;
2 fitters - 2 слесаря механосборочных работ.
Copyright © Siemens AG 2008. All rights reserved.
Page 3
2008
Siemens Production System – Success Story
Company
4. Production Strategy (производственная стратегия)
The organization of technological process on assembly and testing ofproduction on new area at introduction SPS-program
Организация технологического процесса по сборке и тестированию
изделия на новом участке при внедрении SPS-программы;
The localization of production near 20% from the while disconnectors
Локализация производства около 20% от разъединителя (рама);
Decrease of labor intensity by introduction special devices
Снижение трудоемкости за счет внедрения специальной оснастки;
Increase of production on 10% with help special device
Увеличение производительности на 10% за счет приспособлений;
Flexibility if type of product will be change
Гибкость при изменении типа продукта.
Copyright © Siemens AG 2008. All rights reserved.
Page 4
2008
Siemens Production System – Success Story
Company
5. SPS Implementation/Road Map (внедрение SPS/поэтапный план действий)
Phase 1Case analysis
(анализ ситуации)
Phase 2
Elaboration of measures
(разработка мероприятий)
Phase 3
Realization
(реализация)
Copyright © Siemens AG 2008. All rights reserved.
Page 5
2008
Siemens Production System – Success Story
Company
6. Current status of area (текущее состояние участка)
Copyright © Siemens AG 2008. All rights reserved.Page 6
2008
Siemens Production System – Success Story
Company
7. Current scheme of area (текущая схема участка)
71. S DS =576м 2
Смежный участок
Processing
facilities
6
24000
Processing facilities
2. S K =81 м 2
3. Lift crane on area Q=5т.
4.Lift track on area.
5. Procurement
S=12*5(м 2 )
6. Drive testing
S=5*5(м 2 )
6.1. Table for testing
6.2. Units
7. Main contact system testing
S=7*5(м 2 )
7.1 Table for testing
7.2 Assembly line
8 Stand
Working area
12000
____ Movement line of lift track
5
K
8
9000
12000
24000
Copyright © Siemens AG 2008. All rights reserved.
Page 7
2008
Siemens Production System – Success Story
Company
8. After introduction of special devices (после внедрения специальных устройств)
Copyright © Siemens AG 2008. All rights reserved.Page 8
2008
Siemens Production System – Success Story
Company
9.
Interaction pattern inside of area(схема взаимодействия внутри участка)
P.A.: Storage
Warehouse deliver
components for
disonnectors according to
specifications
P.A. : Motor
drive
P.A.: Current
Week plan – 75 pcs
Tact time - 1.6 h
Human resource - 1 worker
Variant №1
Variant №2
Variant №3
Variant №1
Variant №2
Variant №3
6x6mxm
6x6,5mxm
6x7mxm
P.A.: Base channel
path
Week plan – 60 pcs
Tact time - 1.6 h
Human resource - 1 worker
Week plan – 75 pcs
Tact time - 1.6 h
Human resource - 2workers
Variant №1
Variant №2
Variant №3
6x10mxm
6x10mxm
6x10mxm
5x10mxm
6x10mxm
6x10mxm
P.A.: Complete
Week plan – 25 pcs
Tact time - 1.6 h
Human resource - 1 worker
(+1 from other side)
Variant №1
Variant №2
Variant №3
6x11mxm
10x10mxm
8x14,5mxm
P.A.: Storage
Warehouse take
produced disconnectors
for keep and next
dispatch
Copyright © Siemens AG 2008. All rights reserved.
Page 9
2008
Siemens Production System – Success Story
Company
10. The components from stock are delivered on 1 tact (компоненты со склада поставляются на один такт)
Copyright © Siemens AG 2008. All rights reserved.Page 10
2008
Siemens Production System – Success Story
Company
11. The components from stock are delivered on one day (компоненты со склада поставляются на 1 день)
Copyright © Siemens AG 2008. All rights reserved.Page 11
2008
Siemens Production System – Success Story
Company
12. The components from stock are delivered on week (компоненты со склада поставляются на неделю)
Copyright © Siemens AG 2008. All rights reserved.Page 12
2008
Siemens Production System – Success Story
Company
13.
Comparison analysis of variants(сравнительный анализ вариантов)
Copyright © Siemens AG 2008. All rights reserved.
Page 13
2008
Siemens Production System – Success Story
Company
14. Contact
NameDepartment
Address
Phone:
Fax:
E-Mail:
Copyright © Siemens AG 2008. All rights reserved.
Page 14
2008
Siemens Production System – Success Story
Company