Similar presentations:
Element list page
1.
GENERALCEMEX is always spelled in capital letters, so the website tab looks like this:
Can we fix the current way it looks?
2.
PROJECT LIST4
1
3
2
5
3.
PROJECT LIST11. Project phases are (in order) : concept, design, tender 1, tender 2, construction, post
sales. (See Customer Challenges spreadsheet, column
No numbers are
B B.
needed before the phase
22. Can we have: “Address” instead of “Location”?
33. Can we swap the fields Georeference and Address, so that Address appears on top of
Georeference, right after Phase?
44. Can we also order projets by volume, from bigger to smallest amounts
5. I am collecting the list of segments and subsegments. I will send it to you as soon as I have
5
it.
4.
Customer challengesB
D
E
F
G
H
5.
ELEMENT PAGEB. Element groups and elements are in the Construction System spreadsheet, columns B and
C. When an element group is selected, only the relative Elements are displayed in the
drop down menu.
C. Element name
D. Element description
E. Construction System title (there are up to 4 or 4 construction systems per element)
F. Picture of each construction system
G. Description for each construction system
B
F
C
D
E
G
6.
Construction systemsB
C
D
E
F
G
7.
ELEMENT PAGE6
7
61. The sentence “ISelect the benchmark material related with the selected constriction
system.” Should be substituted with: “Write the benchmark material that your client is
using (or planning to use) in the specific construction system.”
72. It’s a free text field
8.
ELEMENT PAGE8
9
11
10
81. Text to add in the callout for Decision Maker: “The person that has the decisional power
(not purchase power) to select a specific construction material to be used for the
construction element in analysis.”
92. Text to add in the callout for Influencer: “The person that has the power to influence – for
good or for bad – the decision of the person that selects the material to be used.”
103. ADD NEW CONTACTS can be substituted with ADD OTHER CONTACT
114. Is it possible to have fields that autocomplete when people start typing?
9.
ELEMENT PAGEE
H
E
E
F
D
G
10.
ELEMENT PAGEE1. Customer challenge name (see customer challenges spreadsheet)
F2. Challenge tagline, in column F of the excel of customer challenges, is missing here
3. Text for the call out for each challenge
H
D4. Description of the customer challenge
G5. Picture for each challenge
11.
ELEMENT PAGE12
D
13
E
F
B
12.
ELEMENT PAGE121. In order to select a new challenge people scroll through 6 pages, each corresponding to a
project phase, with the name on top and the number of challenges contained.
132. The picture hides the name and tagline
13.
ELEMENT PAGE14
15
141. Customer questions is not a mandatory field
152. REQUEST TECHNICAL SUPPORT is hidden at this point
163. Customer feedback can be set by default as “no feedback yet”
14.
CREATE NEW PROJECT PAGE19
18
21
20
17
15.
CREATE NEW PROJECT PAGE171. Ownership and assignment are hidden for this version. They will be in version 2
182. The map also will not be available. We can replace the text in the box with this:
“Add the general information about the project here on the right. Below, use the diagram to
indicate the main companies involved: Main Developer/Owner, the Project Manager, the
Main Designer, the Main Contractor, and the Supervisor.”
191. “Concrete volume” (not material volume) is a free text filled with numbers only.
202. Units can be selected between m3 and y3
213. The diagram goes below the page. This same diagram substitutes the top part of the
Companies and Responsibilities
16.
ELEMENT LIST PAGEB
22
24
B
23
17.
ELEMENT LIST PAGEB1. Project phases do not need to have the numbers.
222. To clarify the interaction in the page: no matter where people click (in the case of this
page people are in DESIGN) the project is in a specific stage that corresponds to the most
advanced stage where there is an Analisys of an element available. In the case of this
page, it is TENDER 1. Therefore, the project is in TENDER 1 phase, which means that on
top, tender 1 should be highlighted in White, just like the phase Concept. This project will
be in phase TENDER 1 and when people look for projects in tender 1 they should find this
project.
233. I wonder if it is possible to have the name of the product suggested in the value
proposition instead of the “See analysis” link
244. When we create a new element I wonder if it should mention in which Project phase we
are creating the new element. What do you think?