Attribute matrix elaboration and approval
Purpose and ground of work
Performance target
Traceability of data
proposed Customer and owner attribute matrix approval process
Example of object card
Issue of project documents or parts of documents
Pros and cons of suggested approach
828.64K
Category: informaticsinformatics

Attribute matrix elaboration and approval

1. Attribute matrix elaboration and approval

Engineering & Construction Division State Atomic Energy Corporation ROSATOM
Attribute matrix elaboration and
approval
Daria Timshina, Valery Glassner
ASE Group
23.05.2019-24.05.2019

2. Purpose and ground of work

PURPOSE AND GROUND OF WORK
Attribute matrix is elaborated to formalize the
conception of information about configuration
items in CAD and to form information model.
Matrix consists of physical and functional
objects, relations between them and their
characteristics in accordance with scope of
General designer (GD).
Requirements for information model are set
forth by App 1.1, chapter 2.12 of EPC contract
between MVM Paks II and JSC EC ASE.
EPC
contract
Requirements
for IM
Attribute
matrix
Item types
Attributes
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to ASE group and its affiliated companies. ASE
disclaims all responsibility for any and all mistakes, quality and completeness of the information.
2

3. Performance target

PERFORMANCE TARGET
Determination of common rules for management of items
and their attributive structure in GD’s and other Project
participants’ CADs;
Organization of centralized management of information
system list of items and their attributes (role of GD on design
stage);
Unification of used attributes by development of attribute
glossary;
Ensuring the data exchange between Project participants;
Control of design solutions based of input data from
adjacent divisions;
Change management during Project development;
Harmonization of project data from all Project participants.
Information model of
Paks-2 NPP
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to ASE group and its affiliated companies. ASE
disclaims all responsibility for any and all mistakes, quality and completeness of the information.
3

4. Traceability of data

TRACEABILITY OF DATA
Source of engineering data:
• Justified and documented design solutions
(reports / design notes / schemes / specifications);
• Initial data received as Project Documents from
adjacent divisions of GD or Subcontractors.
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to ASE group and its affiliated companies.
ASE disclaims all responsibility for any and all mistakes, quality and completeness of the information.
4

5.

Control valves / Арматура
регулирующая
Check valves / Арматура
обратная
Tanks and vessels / Баки и
емкости
Heat exchanging equipment
/ Теплообменное
оборудование
Drains / Трапы
Embedded pipelines /
Трубопроводы закладные
Diesel drive / Дизельный
привод
Filter / Фильтр
Sample preparation device/
Устройство подготовки
проб
Решетка с ковшовым
грейфером / Grid with
busket gripper
Вращающееся сито
внутреннего подвода воды
/ Rotating screen of
internal water supply
%
DD
-
-
-
-
-
-
-
-
-
-
DD
-
-
-
-
m3 /h
BD
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
м/m
-
-
-
DD
-
-
-
-
-
-
-
-
-
-
-
-
m3 /h
nm3/h
-
-
-
DD
-
-
-
-
-
-
-
-
-
-
-
-
m3 /h
nm3/h
DD
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
m H2 O
BD
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
m H2 O
DD
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
%
DD
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
m H2 O
DD
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
yes/no / да/нет
DD
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Tight process pipe
penetration of the reactor
building containment /
Герметичная
Tight process penetration
of the reactor building
containment sump tank /
Герметичная
Unit of measurement or characteristic/
Единица измерения или характеристика
Safety valves / Арматура
предохранительная
Attribute name/
Наименование атрибута
Isolation valves /
Арматура запорная
• One summary file with several lists
containing equipment divided by
responsible specialties;
• Limited information about attributes;
• No unification of attributes between
specialties is provided;
• Interfaces
between
specialties
within departments of GD and other
project participants can not be defined;
• Equipment types do not correspond
with equipment classifier in SPF;
• Traceability of data can not be
provided;
• Types of documentation can not be
defined.
Pump units / Насосные
агрегаты
CURRENT PRESENTATION OF ATTRIBUTE
MATRIX
Efficiency/
КПД
Nominal flow rate/
Расход номинальный
NPSH(r) (Net Positive Suction Head (required)) / Требуемый
кавитационный запас
Kvs / Пропускная способность
Operating range of flow rate/
Рабочий диапазон расхода
Head at nominal flow rate/
Напор при номинальном расходе
Operating range of head/
Рабочий диапазон по напору
Allowable deviation of the head/
Допустимое отклонение по напору
Head under non-flow mode/
Напор в безрасходном режиме
Body and connection pipes of component are of uniform strength/
Корпус и патрубки компонента равнопрочные
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to ASE group and its affiliated companies. ASE
disclaims all responsibility for any and all mistakes, quality and completeness of the information.
5

6. proposed Customer and owner attribute matrix approval process

PROPOSED CUSTOMER AND OWNER
ATTRIBUTE MATRIX APPROVAL PROCESS
Main stages of matrix development and approval:
Development is proceeded in whole
matrix to ensure the unification and
harmonization of used data;
Approval is handled by division of
matrix into separate cards for each item
type (i.e. tank, pump, valves & etc.) with
appropriate list of attributes;
Attributes are categorized for filtering
and readability;
All specialties are involved in
development and approval process of the
card (responsible for card and responsible
specialists for attributes).
Attribute
ID
Attribute name
00001

…N
Obj_type1
Obj_type2

Obj_typeN
-
A
-
A
-
-
-
-
A
-
A
-
Equipment types correspond with equipment classifier in
SPF/IMS Enovia
Attribute
matrix
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to ASE group and its affiliated companies. ASE
disclaims all responsibility for any and all mistakes, quality and completeness of the information.
6

7.

CATEGORIZATION OF ATTRIBUTES

CI
CI
CI
Identification
Category2
Category1
Category

Category
0
Identification
1
Components
2
Dimensions
10 HVAC
Transportation and
11
handling
12 I&C
3
Materials
13 Fire-protection
4
Procurement
14 Environmental
5
Quality
15 Radiation monitoring
6
Related documents
16 Physical protection
7
Location
17 IT-safety
8
Electrical
18 Classification
9
Process
-
-
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to ASE group and its affiliated companies. ASE
disclaims all responsibility for any and all mistakes, quality and completeness of the information.
7

8. Example of object card

EXAMPLE OF OBJECT CARD
• Each card describes one considered object comprehensively;
• Agreed attributes are approved in accordance with another object just in scope of
necessity for appropriate object during approval of another cards (name, description,
data type & etc. – do not change).
Attribute
ID
Attribute
name

Category
Source of
attribute
name/descripti
on
Project
stage
Data type
Unit of
measurem
ent
List of
values
Status of
responsibil
ity for
value
00056
Attribute 1

Identification
-
BD
Text
-
-
Defined by
GD, can not
be changed

Attribute2

Process
-

-
-
-





-
DD
-

-

-
Not defined
Vertical /
by GD,
Horizontal /
received as
Circular
ID
…N
Attribute N

Electrical
IEC 60050
DD
List (One)
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to ASE group and its affiliated companies. ASE
disclaims all responsibility for any and all mistakes, quality and completeness of the information.
8

9. Issue of project documents or parts of documents

ISSUE OF PROJECT DOCUMENTS OR
PARTS OF DOCUMENTS
CI
CI
Process equipment
CI
CI
CI
CI
CI
HVAC equipment
Issue of documentation or parts of
documents describing the object
type characteristics will be
organized by specialties in
accordance with appropriate scope
with providing of adjacent divisions`
approval.
CI
CI
CI
CI
CI
Turbine and auxiliary
systems equipment
CI
etc
The content of this presentation is for discussion purposes only, shall not be considered
as an offer and doesn’t lead to any obligations to ASE group and its affiliated companies.
ASE disclaims all responsibility for any and all mistakes, quality and completeness of the
information.
9

10. Pros and cons of suggested approach

PROS AND CONS OF SUGGESTED APPROACH
Advantages
Disadvantages
Scope to be approved by JSC ATOMPROEKT, JSC ASE EC and
MVM Paks II is defined in accordance with equipment classifier in SPF
and type of documents.
Efficient process of approval excluding the duplication of work
Development is proceeded in whole matrix to ensure the unification and
harmonization of used data
Necessity of tight control of correspondence
Efficient process of implementation of Owner`s comments
Unification and common understanding of attributes between GD and
other project participants
Convenient way of data presentation
Approval process of amount of data presented in DB is finalized before
issue of appropriate project documents
Relatively small increase of time for preparation
of object types cards
Attributes are reviewed in connection to objects (option to start object
implementation to information model after approval is granted)
Necessity of several specialists according to
categories to be involved in development and
approval process
Sending of documentation / parts of documentation for approval in
accordance with object completeness in scope of one specialty
Review of several documents / parts of
documents instead of one
10
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to ASE group and its affiliated companies. ASE
disclaims all responsibility for any and all mistakes, quality and completeness of the information.
English     Русский Rules