Similar presentations:
Project Planning and Configuration. Siemens
1. Project Planning and Configuration
SIMATIC S7Siemens AG 2000. All rights reserved.
Date:
File:
16.02.23
GRAPH_02e.1
SITRAIN Training for
Automation and Drives
2. Planning and Configuration
SIMATIC S7Siemens AG 2000. All rights reserved.
Date:
File:
16.02.23
GRAPH_02e.2
SITRAIN Training for
Automation and Drives
3. Основные элементы последовательности (1)
S3Step 3
Step: Step No. (No. max. 999) and step name
(max. 24 contiguous characters)
S1
Step 1
Initial step:
Execution start without querying a start transition after sequencer
RESET (INIT_SQ) or return jump or initial start of the sequencer
T5
trans5
SIMATIC S7
Siemens AG 2000. All rights reserved.
Transition
The transition contains the conditions which allow modedependent enabling from one step to the successor step.
Date:
File:
16.02.23
GRAPH_02e.3
SITRAIN Training for
Automation and Drives
4. Основные элементы последовательности (2)
End of sequencerПрограмма отключается полностью, когда достигнут конец
программы. Программа может быть начата снова только выбором
разрешенного шага в этой программе (например, начальный шаг или
через выбор шага)
Приложения: Задачи, которые выполняются однократно, например,
approach / retract program
S xxx
SIMATIC S7
Siemens AG 2000. All rights reserved.
Jump to a step
(вперед или назад)
Application: cyclic execution, machine loop
Date:
File:
16.02.23
GRAPH_02e.4
SITRAIN Training for
Automation and Drives
5. Основные элементы последовательности (3)
Open alternative branchApplication: left branch error-free,
right branch with errors
Только один переход может быть активен в автоматическом
и inching режимах. Переход в левой ветви всегда имеет
приоритет 1, все другие перемещения согласно порядку
расположения.
Исполнение - сверху вниз и слева направо.
Close alternative branch
The corresponding branch is also closed for execution to the
left.
Evolution is from top to bottom and right to left.
1st priority
2nd priority
Priority sequence in limit case: all Tx simultaneously satisfied
SIMATIC S7
Siemens AG 2000. All rights reserved.
Date:
File:
16.02.23
GRAPH_02e.5
SITRAIN Training for
Automation and Drives
6. Основные элементы последовательности (4)
Open simultaneous branchSynchronization of all associated steps after the opening
branch in the same PLC cycle.
Then each branch is independently executed.
Possible to enable all branches in the same PLC cycle
First steps are also called opening steps
Close simultaneous branch
Synchronization at joining, i.e. all branches wait for one
another until all steps preceding the closing branch are
active. Only then is execution switched simultaneously to the
left branch via the successor transition.
Last steps are also called closing steps.
SIMATIC S7
Siemens AG 2000. All rights reserved.
Date:
File:
16.02.23
GRAPH_02e.6
SITRAIN Training for
Automation and Drives
7. Основные элементы последовательности (5)
SIMATIC S7Siemens AG 2000. All rights reserved.
Date:
File:
16.02.23
GRAPH_02e.7
SITRAIN Training for
Automation and Drives
8. Сохранение последовательности
Test run possible!Sequencer as FB
S1S1
S13
T1
No test run possible!
Display
always as
S7-GRAPH
sequencer
Sequencer as GRAPH
source file
S1
T1
T13
G
en
er
at
e
Save
Save As...
Open/
Insert
S7 block
Blocks
So
ur
c
le r )
p i i le
m p
Co om
(C
Open/
Insert
e GRAPH source
Siemens AG 2000. All rights reserved.
T13
Save
Save As...
Source files
Entry/use in STEP 7
symbol list
Symbols
SIMATIC S7
S13
Date:
File:
16.02.23
GRAPH_02e.8
SITRAIN Training for
Automation and Drives
9. Создание, загрузка и сохранение последовательности как исходного файла GRAPH
SIMATIC S7Siemens AG 2000. All rights reserved.
Date:
File:
16.02.23
GRAPH_02e.9
SITRAIN Training for
Automation and Drives
10. Как использовать редактор исходников S7 - GRAPH
SIMATIC S7Siemens AG 2000. All rights reserved.
Date:
File:
16.02.23
GRAPH_02e.10
SITRAIN Training for
Automation and Drives
11. Создание, загрузка и сохранение последовательности как FB
Важно: Перед открытием FB вы должны выбрать "GRAPH" как язык,на котором создается блок! (это нельзя изменить позднее)
SIMATIC S7
Siemens AG 2000. All rights reserved.
Date:
File:
16.02.23
GRAPH_02e.11
SITRAIN Training for
Automation and Drives
12. Упражнение (1): Сборочная линия с 1 участником
S1Вкл/Выкл
линии
?
Ba
y
1
T1
INI 1
LS 1
индуктивный датчик Фотодатчик
S2
Конечная
сборка
T2
S3
SIMATIC S7
Siemens AG 2000. All rights reserved.
L
R
M1
Мотор
H1
Светодиод
S1
Кнопка подтверждения
Date:
File:
16.02.23
GRAPH_02e.12
SITRAIN Training for
Automation and Drives
13. Упражнение (1): Сборочная линия с 1 участником (Contd.)
S1T1
S2
T2
S3
SIMATIC S7
Siemens AG 2000. All rights reserved.
Date:
File:
16.02.23
GRAPH_02e.13
SITRAIN Training for
Automation and Drives
14. Упражнение (2): Сохранение последовательности как FB1 (+DB1)
Сборочная линия с 1 участникомS1
T1
S2
T2
S3
SIMATIC S7
Siemens AG 2000. All rights reserved.
Date:
File:
16.02.23
GRAPH_02e.14
SITRAIN Training for
Automation and Drives
15. Упражнение (3): Проверка FB1 (+DB1) в STEP 7
Сборочная линия с 1 участникомS1
T1
S2
T2
S3
SIMATIC S7
Siemens AG 2000. All rights reserved.
Date:
File:
16.02.23
GRAPH_02e.15
SITRAIN Training for
Automation and Drives