Similar presentations:
Project Documents in Architecture
1.
PROJECT DOCUMENTS INARCHITECTURE
2.
PLAN• Three aspects in architecture
• Architectural design
• Sketch project
• Working project
3.
THE THREE MAIN JIHADS OF ARCHITECTURE?
• The Roman architect Vitruvius defined the basic quality of an architectural structure according to the classical
formula as follows
• Consistency (Construction)
• Benefits (Function)
• Beauty (Aesthetics)
4.
ARCHITECTURALDESIGN
In architecture, design consists of
several parts. These are sketches, as
well as working drawings.
5.
PRE-PROJECT WORKBefore the start of construction work,
the customer applies for a building
permit in a single window, and after
the permit is issued, another
application is submitted to obtain
construction requirements. That is,
APZ is an architectural and design
task. Geology and topography of the
construction site will also be obtained.
6.
ARCHITECTURAL DESIGN TASKSADT- architectural-design task. APZ is a set of urban planning and
architectural requirements, special conditions for the design and
construction of the facility arising from the rules of approved urban
planning documents, relevant decisions of public authorities, including
historical and cultural monuments, environmental protection
requirements and conditions, environmental -environmental
protection, a document containing the legal rights and interests of third
parties. when placing the object on a particular plot of land, on the basis
of which the project documentation for the construction
(reconstruction) of the object was developed.
ADT (Part I) - defines the general requirements for the appearance of
buildings or structures, the approximate areas of buildings, parking lots,
entrances and exits from the area, the arrangement of small
architectural forms, landscaping and others.
ADT (Part II) - sets out the basic requirements for the installation of
roads and utilities.
7.
GEOLOGYConstruction engineering research - for a
comprehensive study of the natural conditions of
the area, the plot, the planned construction
route, local building materials and water supply
sources, and to develop cost-effective and
technically efficient solutions for the design and
construction of facilities work to obtain the
necessary and sufficient materials. obtaining
information for the rational use and protection of
the environment, as well as forecasting of
environmental changes under the influence of
construction and operation of enterprises,
buildings and structures.
8.
TOPOGRAPHICTopographic survey (also geodetic or land survey) is a set of works performed to obtain original copies of
topographic maps or land plans, as well as to obtain topographic data in another form.
It is done by measuring distance, height, angle, etc., using various instruments, as well as taking ground
images from planes (aerial photography, space photography).
9.
SKETCH PROJECTA sketch project is an architectural and
construction design phase. At this stage, the
initial design of the object is carried out, which
allows to determine the main features of the
building, its location and appearance. That is, the
sketch design allows the customer to have a
detailed idea of the future structure of the
structure, i.e. to see the drawings of the interior
floor plan and the exterior of the house, including
the size.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
WORKING PROJECTThe working project is the final stage of architectural and construction work. At this stage, there will be direct preparation for the
construction of the building. Experts study the following initial data - the relief characteristics of the area where the building is to be
built, soil, communications, and so on. Based on this, the architects create the project with the most optimal solution.
пояснительная записка
explanatory note
генеральный план
general plan
архитектурные решения
architectural solutions
конструктивные решения
Constructive decisions
водопровод и канализация
отопление и вентиляция
water supply and sewerage
электрооборудование и электроосвещение
heating and ventilation
сигнализация автоматизация систем вентиляции, отопления, дымоудаления
electrical equipment and electric lighting
проект организации строительства
alarm automation of ventilation, heating, smoke removal systems
смета и т.д.
construction organization project
estimate, etc.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
КОНСТРУКТИВНЫЕ РЕШЕНИЕ• КР- Конструктивными решениями называют
раздел в составе проектной документации,
который отражает архитектурные решения в
виде конкретных расчетных данных.
• КЖ-Проектирование железобетонных
конструкций выполняют для устройства
фундаментов, обустройства плит
перекрытий, возведения колонн, ригелей и
диафрагм жесткости (если речь идет о
каркасных зданиях), устройства лестниц и
консолей.
• КМ-При строительстве нежилых объектов
довольно часто применяются
металлоконструкции. рабочую
документацию по конструкциям можно
разделить на две группы. Первая — это
непосредственно документация по
конструкциям металлическим.Она
составляется на основе материалов
техпроекта для последующего создания
деталировочных чертежей. Вторая часть —
деталировка металлических конструкций. В
этом случае прорабатываются все элементы
конструкций по отдельности.
64.
CONSTRUCTIVE PART• SS-Structural solutions is a section in the design
documentation that reflects architectural
solutions in the form of specific design data.
• RC-Design of reinforced concrete structures is
performed for the construction of foundations,
the arrangement of floor slabs, the erection of
columns, crossbars and stiffening diaphragms
(when it comes to frame buildings), the
arrangement of stairs and consoles.
• MS-In the construction of non-residential
buildings, metal structures are often used.
working documentation on structures can be
divided into two groups. The first is the
documentation on metal structures directly,
which is compiled on the basis of the technical
design materials for the subsequent creation of
detailed drawings. The second part is the
detailing of metal structures. In this case, all
structural elements are worked out separately.