2.79M
Category: managementmanagement

Warehouse management, management monitor. Transportation planning

1.

WAREHOUSE
WAREHOUSE MANAGEMENT
MANAGEMENT MONITOR
MONITOR
Transportation Planning
1

2.

TWO
TWO NODES
NODES –– TWO
TWO VIEWS
VIEWS –– TWO
TWO MONITORS
MONITORS
Transportation Planning Monitor
Detailed
Planning
Shift Planning
Nutts Corner | Transportation Department
2

3.

TRANSPORTATION
TRANSPORTATION PLANNING
PLANNING
Transportation Methods
Change TU attributes (staging time,
loggers…)
Open HU-view lower level
Change TU status (rough planning
finished…)
Re-assign HUs
Change stop sequence
Load HU(s)
Assign lanes to AA/store
Unload HU(s)
Assign door
Re-assign deliveries
Assign vehicle
Re-place HUs
Change to TA /SCWM/TU
3

4.

AVAILABILITY
AVAILABILITY MATRIX
MATRIX
Transportation Unit Status
STO
DELI
P_SE
VERY HU_
VEHI
Q_C TU_C LANE _REA REA DOO CLE_
HU_
HAN HAN _ASS SSIG SSIG R_AS SELE HU_L UNL POS
GE GE IGN
N
N SIGN CT OAD OAD T GI
1
1
1
1
1
1
1
0
0
0
STATUS
E0001
 
Initial
E0002
Rough Planning finished
1
1
1
1
1
1
1
0
0
E0003
Loading Released
1
1
1
1
1
0
0
1
1
E0004
Loading Started
1
1
1
1
1
0
0
1
1
E0005
Loading Finished
1
1
0
0
0
0
1
0
0
E0006
Goods Issue Posted
Nutts Corner | Transportation Department
0
This matrix shows
which actions are
available to you in
the Transportation
Planning Monitor in
general.
1
0
4
English     Русский Rules