Specific Training Packages
Unit 300
The purpose of STP Training is that the operator will have understanding and awareness of the following topics.
Introduction and purpose to the unit
Unit 300 position on the Plant overview
Process Description
Process overview
Process overview
Major equipment
Health, Safety and Environment
Routine Checks & Quality Control
4.66M

Unit_0300_Well_Water[2]

1. Specific Training Packages

STP
Specific Training Packages
7000-S-03-90-T-0008-00
Specific Training Package
12:47
1

2. Unit 300

Sakhalin Energy LNG/OET/TLU
STP
Unit 300
Specific Training Package
12:47
2

3. The purpose of STP Training is that the operator will have understanding and awareness of the following topics.

1.
Process Introduction
2.
Purpose of the Unit
3.
Process description
4.
Equipment
5.
Health, Safety and Environment
6.
Routine checks and Quality control
Specific Training Package
12:47
3

4. Introduction and purpose to the unit

Well water is pumped from four 50m
deep wells approximately 6km north of
the LNG site to supply the construction
camp with water in the early stage. Later
the LNG site will be supplied.
Specific Training Package
12:47
4

5. Unit 300 position on the Plant overview

Plant overview
Unit 300 position
on the Plant overview
pig
6 km North of the site
U/S
3600
6400
ETP
3300
0300
0300
F4101
4000
EDG
1500
1400
4100
4200 4400
K1450
K1420/30
4100
4200 4400
K1450
K1420/30
U1300
A4420
K4701AB
U/S
U1100
4000
GTG
U4100
K1440
U4200
Train 2
A1911
A4720AB
K4401
Train 1
K4711
9000
4300
U1100
4600
U1300
4200
1100
4800
U4100
1500
U4200
1400
K1440
6400
CDF
6200
3400
K3401
pig
1000
1600
3100
3400
6000
4100
4900
Specific Training Package
12:47
5

6. Process Description

Wells and Pumps:
Each well is 50 meters deep.
The pumps are submerged-type
with a capacity of 50m3 for each
pump.
Water is pumped by four
well pumps to two common
underground pipelines to the
LNG site and the Construction
camp.
Specific Training Package
12:47
6

7. Process overview

Pipelines:
The HDPE pipes (high density polyethylene) are located
underground below the frost line. Any aboveground pipes
are insulated and heat traced.
The pipes run through hilly terrain with a maximum
elevation of approximately 100 meters from the bottom of the
wells.
Each line has a maximum capacity of 100m3.
Specific Training Package
12:47
7

8. Process overview

SECONDARY LINE
PRIMARY LINE
TO
CONSTRUCTION
CAMP
(UNTIL
CONSTRUCTION
COMPLETION)
P-301A
P-301B
P-301C
P-301D
TO FRESH
WATER
TREATMENT
AND DEMIN
UNIT
TO FIRE
WATER
POND
Specific Training Package
12:47
8

9. Major equipment

Equipment:
Four well pumps.
Four Well Shelters.
The well heads and above
ground discharge piping are
protected from the elements by
heated shelters.
Two HDPE pipelines (high
density polyethylene) each
6.3km long.
Specific Training Package
12:47
9

10. Health, Safety and Environment

Health & safety:
Wild life.
Winter conditions.
Operation of valves in the underground valves pit
The pits can accumulate toxic gases and be low on oxygen.
(Confined space)
Environment:
This unit will have non impact on the environment.
Specific Training Package
12:47
10

11. Routine Checks & Quality Control

Routine Checks & Quality Control
Checks to be done:
Check (condition of the shelters door locked etc.)
Check the heating system in the shelters.
Check for leaks.
Check running equipment.
Fill in log sheet.