Similar presentations:
GREFEEDFM_eF7.852.255-PCBA Cover_TPE-2026-04-17
1.
TOOLING FEASIBILITY REPORTDesign for Manufacturing
05/13/2026 Rev A
2.
Basic informationCustomer:
C0641
Project Name
M0089
Runner Type:
Cold Runner
Cavities:
1x1
Part Name:
eF7.852.255 - PCBA Cover
Surface finish:
SPI-D1 Natural
Tonnage
/
Mold Structure & Steel:
S136H
Thickness:
1.48mm
No. Of Slider Per Cavity:
0
No. Of Lifter Per Cavity:
0
Part material
TPE 20A TC3TPN
Confirmed
(Shrinkage 1.015 Pls comfirm)
Part Weight:
5g
Designer :Liu
Design manager comments ------
Mold Number:
Project manager comments -----
DFM Version
Submission Date
Submission Date
1
First submission
2026-04-17
05/13/2026 Rev A
Approval
For unific
apply the
color, sam
for fire se
PSBF.203
HAMBER
(as both p
sensor an
– are ord
customer
Gr
20
3.
ContentThis document is used to transmit a DFM during the quotation stage for a detailed presentation of
the potential injection mould.
3
General Information
4
Parting Line
5
Gate location & type
6
Mould Layout
7
Slider & Lifter
8
Inserts
9
Ejection
10
Surface
11
Draft angle analyze
12
Analysis Wall
Thickness
13
Engravings
14
Issues & Proposals
15
Cooling System
4.
3.General InformationPart Size (L x W x H): D103.74X13.5mm
05/13/2026 Rev A
5g
Page 4
5.
分型面4. Parting line
CAV
COR
The red line is the parting line,
Pls kindly comfirm
红色线为 PL 线 请确认。
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
05/13/2026 Rev A
YES
6.
5. Gate location & typeSide
Gate
Tap
Gate
Sub
Gate
Direct
Gate
Moon
Gate
Pin
Point
Gate
Hot
sprue
Hot
Runner
System
X
Gate size :Ø0.8mm
Gate vestige: 0.2 mm
Cold runner to submerged gate.
冷流道转潜水口进胶
进胶口 Ø0.8mm
胶口残留 0.2mm
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
05/13/2026 Rev A
YES
7.
6.Mold layoutTop side
Operator side
]
non operator side
Bottom side
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
05/13/2026 Rev A
YES
8.
分型面7. Slider & Lifter
N/A
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
05/13/2026 Rev A
9.
分型面8. Insert
N/A
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
05/13/2026 Rev A
10.
9. Ejection locationØ8mm Ejector pin
Ø6mm Ejector pin
Ø8mm 顶
针
Ø6mm 顶
针
顶出布局 请确认。
If agree put ‘YES’, if not agree put ‘NO’
Ejection layout,
Please confirm.
05/13/2026 Rev A
YES or NO
YES
11.
10. Surface finishingGreen
Surface:
绿色面做
SPI-D1SPI-D1 Natural
Natural
请确认。
Pls
comfirm
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
05/13/2026 Rev A
YES
12.
11.Draft angle analyzeDraft angle is OK.
拔模斜度 OK
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
05/13/2026 Rev A
YES
13.
12. Wall thickness analyzeThe wall thickness of the
product is uniform.
产品壁厚均匀。
05/13/2026 Rev A
Overall result
Average thickness 0.61
maximum thickness 1.74
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
YES
14.
13. EngravingsN/A
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
05/13/2026 Rev A
15.
14. Issues & ProposalsAfter
Before
现状胶位封不住胶 会有走披锋。建议红色面减胶修正 .
请确认 详见 stp 图档
Currently, the glue area cannot seal properly, resulting in flash. It is
05/13/2026 Rev A
recommended
to correct by reducing the material on the red surface.
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
YES
16.
14. Issues & ProposalsPls Provide 2D drawing
If don’t have it, Pls just
note“No”
请提供产品 2D
图
2D-drawing
will be created later.
Please proceed without drawing.
We will agree on the tolerances with
you.
Grefee: Ok
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
05/13/2026 Rev A
17.
15.Cooling System前模运水示意图 详细以模具图为准。
The cooling sketch map of cavity, the details
based on the tooling design drawing.
05/13/2026 Rev A
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
YES
18.
15.Cooling System后模运水示意图 详细以模具图为准。
The cooling sketch map of core, the details based
on the tooling design drawing.
05/13/2026 Rev A
If agree put ‘YES’, if not agree put ‘NO’
YES or NO
YES
19.
THANK YOU!05/13/2026 Rev A