Well construction, completion, stimulation services and technologies
1.
Well construction, completion,stimulation services and technologies
2.
StructureComplition
service
Production
Facility
Complition
equipment
Drilling service
Service
company
Fracturing
service
Cementation
service
3.
Complition equipment & servicesROTATABLE CEMENTED/UNCEMENTED V0 LINER HANGERS
ROTATING CEMENTING HEAD
Running tools for precementing release liner
hangers
Running tools for
uncemented rotating
liner hangers
Bottom subs for 7”, 4”, 41/2”, and 5” liners
Liner hanger plugs for 7”, 4”, 4-1/2”,
and 5” liners
Gas-tight top packer V0
The ENTIRE range of liner hangers, meeting the specs of
MOST customers and using the SAME set of components;
DISSOLVABLE MATERIALS
Specifications
V0 rated top packer
V0 Top packer with
bidirectional anchor
slips
Dissolution temperature range, °C (°F)
+60 - +120 (140 – 248)
Material
• Plug seats
• Rubber components
Dissolvable magnesium alloy
Water-dissolvable elastomer
Dissolution time in 10% KCl fluid,
≤day
• Plug seats
• Rubber components
7
10
Effective time in OBM, hour
96
UP TO 40 RPM;
A LOAD OF UP TO 200 Tones
(441K lbs)
AN OPERATING PRESSURE OF UP
TO 550 BARS (8000 PSI)
A TORQUE OF UP TO 40 KN*m (29.5 kip ft)
CAN BE FITTED WITH TWO PUMP-DOWN
PLUGS
4.
Complition equipment & servicesSELECTIVE CUP-TYPE PACKER
MOTOR
FRAC SLEEVE PUMP-DOWN TOOLS
REAMER
STATOR
ROTOR
SHAFT
BODY
Multifrac sleeve with
dissolvable plugs
Swellable packer
REDUCTION
GEAR
SUB
REAMER SHOE
Aluminum-alloy (easy
drillable)
reamer nose
Ball-drop frac sleeve
Hydraulic frac sleeve
Circulating
ports
DRILLABLE SECTION MADE OF D16T ALLUMINIUM
ALLOY
5.
Factory plan (equipment to be produced)Liner hangers equipment
Swellable packers
Centralizers
6.
Factory plan (equipment to be produced)Liner hangers equipment
Swellable packers
*Autoclave is based on the outstanding territory (safety rules)
Centralizers
7.
ROAD MAPPhases
Description
Deadlines
1
Experimental field work on 8 wells for 7”/
9-5/8” liner-hangers
2
Commercial proposal for the construction 2 months
of a joint plant in Oman. Meeting in Oman
office with the company owners.
Signed contract
3
Building the plant
16 months
Starting upper localisation:
• Swellable packers
• Liner-hangers
• Centralizers
4
Expansion of production
12 months
Expansion of localization:
• Swellable packers
• Well screens
• Liner-hangers
• Centralizers
• Threading
• Float equipment
• Other perspective
equipment
6 months
Result
Signed document on the
successful completion of the
work
8.
Drilling services9.
Fracturing & Cementing services№
Frac units
1
Pump unit YLT105-1680
2,500 hp, 2500Q quintuplex pump,
15,000 PSI
2
4
5
6
Frac blender HST10, HST12
up to 16 m3/min, a proppant rate of up
to
7,500 kg/min
Hydration unit HPGYT100,
HPGYT120
mixing rate of up to 16 m3/min
Frac job control station YBT24-2
two independent data acquisition and
storage stations, a 220-volt stand-alone
generator
Chemical agent transportation and
pumping unit HTT08
12 pumps, 0.5-180 l/min
AUXILIARY EQUIPMENT
• Labs, sand trucks (frac sand trucks), tank farm, staff vehicle etc.
• A QC lab in each fleet ensures ongoing materials control.
Qty.
№
Double-pump cementing units
Qty.
1
Pump unit JYGJQ70-30
600 hp, quintuplex pump, 10,394 PSI
Pumping rate up to 3,4 m³/min (21,4
bbl/min)
Cement mixing rate up to 2,3 m³/min
(14,4 bbl/min)
Density range 1,3-2,6 g/cm³
11
2
CEMENT BULK PLANT
silo with 30 m³ capacity
15
21
4
4
4
3
Cement trucks
Cement transportation trucks with 25-30 35
m3 capacity
4
Cement laboratory
Laboratory kit with all the necessary
equipment for according with API and
ISO
4
3
ADDITION
• Modern equipment manufactured in 2022
• Highly qualified trained personnel operating the equipment